|
|
Notre Dame Inn Notre Dame University, South Bend, IN
A four-story, full service hotel including kitchen, back of house and a ballroom, with public areas of the hotel being one and two stories in height. The public areas will include lobbies, restaurant, ballroom, back-of-house uses and one outside lanai that will require a supported slab. Approximately 250,000 square feet of poured-in-place concrete and structural steel construction.
Santa Clara University Residence Hall, Santa Clara, CA
This project consists a new four-story, 74,000 square foot residence hall, a new one-story, 9,000 square foot common space connector to existing Casa Italiana Residence Hall and a new garage entrance to the existing Sobrato Hall Garage.
Western Research Institute, Richmond, CA
Phase 1A of this project consists of two, three-story Class A life science buildings, each of which is 90,000 gross square feet and anticipated to be similar but not identical.
Karen Keshet Jewish High School, San Francisco, CA
This is a multiple-phased project of which the renovation of the existing two-story structure is the first phase. The renovation is to take place after the existing buildings comply with the current code provisions necessary to convert to a private high school.
Mid-Peninsula Jewish Community Center Day School, Palo Alto, CA
The first phase of this three-phase project is Classroom Building #1 and the garden area associated with it. The classroom building is a two-story structure over a full basement.
Brandeis Hillel Day School, San Francisco, CA
This project consisted of the construction of a new, two-story Library Wing consisting of 24,000 square feet. In addition to the new Library Wing, this project also included a new retaining wall, the elimination of a portion of the existing classroom wing, and reconstruction of the Arcade running parallel to the northeastern elevation due to dry rot.
Childrens Day School, San Francisco, CA
This first phase of project consists of a new, two-story classroom building with a partial basement and modifications to the existing building for accessibility. The second phase will be the larger renovation to the existing building.
University of the Pacific, Sciences Complex, Stockton, CA
This is a three-building science complex, which will be use for the Biology, Chemistry, and Physics/Mathematics Departments. The Biology Building two stories and 26,560 square feet will be the first phase of this project.
Bard College/F.W. Olin Language Center, Annandale-on-Hudson, NY
Two-story addition to F.W. Olin Humanities Building; has partial basement and one-story connection between the new addition and Humanities Building. Structure designed using structural steel frame; supported floor concrete on metal deck; roof utilizing rigid insulation.
Bard College/Bard Campus Center, Annandale-on-Hudson, NY
This project was the design of a Campus Center on the Bard College Campus in upstate New York.
Gates Computer Science Building Stanford University,
Palo Alto, CA
Five-story, steel frame structure designed to serve as a faculty office building, research and teaching facility. Construction cost $24,000,000.
Healdsburg High School Renovation, Healdsburg, CA
Renovation and reconstruction of approximately 82,000 square feet of the existing high school building, including construction of eight new classrooms in existing covered arcade areas and remodel of existing vocational arts building, as well as a new 12,000 square foot cafeteria/multi-purpose building.
School of Optometry University of California Berkeley,
Berkeley, CA
Two-story, 22,000 square foot addition of laboratory space to existing structure, including seismic upgrade of 44,000 square foot building. Steel frame floors with concrete walls.
UC Berkeley Genetics & Plant Biology Building,
University of California
Berkeley, Berkeley, CA
Reinforced concrete research and teaching lab facility with two levels underground parking; approximately $35 million.
University High School, San Francisco, CA
Project was 7000 square feet in expansion and additions in two areas, including new classrooms and gallery below grade, addition of elevator shaft, which will be attached to the Auditorium/Library building, and a bridge of 350 square feet connecting the lower campus to Student Center.
Donald R. Bren Campus Events Center
University of California Irvine,
Irvine, CA
This project is a 6000-seat, 75,000 square foot, steel frame arena, featuring 200 feet by 200 feet clear span roof structure.
UC Davis Food & Agriculture Building
University of California Davis,
Davis, CA
This project consisted of two buildings of reinforced concrete and post-tensioned concrete. Approximately $35 million.
Kendrick Hall University of San Francisco School of Law,
San Francisco, CA
Steel frame and concrete structure, approximately 12,000 square feet.
Eagle Valley Junior High School, Carson City, NV
The structure is designed using steel and wood and is approximately 78,000 square feet.
California School for the Deaf, Fremont, CA
75,000 square foot school buildings comprised of wood and steel construction.
Terman Engineering Center, Stanford University, Palo Alto, CA
This 150,000 square foot structure is five stories in height and is comprised of two buildings; one building a concrete library, the other a five-story, wood-frame structure. This structure has been noted by the American Society of Civil Engineers as one of the classic wood structures in the United States.
Town School for Boys, San Francisco, CA
This project consisted of a preliminary structural system for addition of a classroom wing and Auditorium addition.
Cowell Hall Classroom University of San Francisco,
San Francisco, CA
This project included rehabilitation of an existing four-story with basement, concrete building, which enclosed approximately 38,000 square feet. There was also an addition of six (6) new classrooms at the existing level floor roof deck, with a total enclosed area of approximately 48000 square feet.
St. Mary's Home For Boys, Recreation Building, Beaverton, OR
The campus recreation building houses a natatorium and gymnasium as well as locker facilities and administration. The 17,000-sf building is one-story wood frame construction with exterior CMU walls.
Grants Pass High School, Grants Pass, OR
Two story, 200,000-sf steel frame high school with performing arts theatre, arena style gymnasium and football grandstand.
Grants Pass High School - General Structural Evaluation,
Grants Pass, OR
Seismic evaluation of this existing multi-building campus totaling 190,000-sf, constructed over a 100-year period. Originally constructed as a single building in 1988, the high school campus currently is comprised of more than nine buildings.
Parkrose High School, Portland, OR
Two story, 200,000-sf steel frame high school and community center.
Westview High School, Beaverton, OR
Two story, 260,000-sf concrete masonry/steel frame high school with a 600-seat performing arts theatre, practicing theatre and a 2,000-seat gymnasium ($22 million).
Gresham-Barlow School District,
District-wide Seismic Evaluation,
Portland, OR
Seismic Risk Analysis of 16 existing school facilities for the Gresham-Barlow School District. The study involves building evaluations, damage estimates, strengthening schemes, cost estimates and presentation of the results to the public.
Silverton Union High School,
General Structural Evaluation,
Silverton, OR
Seismic evaluation of existing multi-building campus totaling 130,000-sf, constructed over a 50-year period.
Mt. Hood Main Academic Building,
FEMA 178 Seismic Evaluation,
Gresham, OR
Seismic evaluation of a two- to three-story, multi-building academic facility; reinforced concrete construction built in phases between 1968 and 1981.
West Linn-Wilsonville School District,
FEMA 178 Seismic Assessment,
West Linn, OR
Seismic evaluation of nine schools in this School District. Submitted report on the expected performance of each facility during a seismic event. A FEMA 178 study was conducted on each facility as well.
The Dalles Middle School, The Dalles, OR
95,000-sf two-story concrete and steel frame construction with pitched roofs; 95 by 135- foot gymnasium with 38-ft tall tilt up concrete walls. Floor system steel beams (37-ft span) with steel deck plus concrete slab. Roofs are steel joist and deck roof framing is exposed in gymnasium and commons.
Milwaukie High School Renovation, Milwaukie, OR
Major remodel and incremental seismic upgrade of existing 2 story high schools. Existing building constructed in several phase from 1919 to 1949 plus minor remodels since. Concrete exterior walls, wood framed interior walls, floors and roof. Upgrade involved addition of wall anchorages, drag strut ties to existing concrete walls and addition of interior concrete block shear walls. Included reinforcement of existing walls with composite fiber reinforcement.
North Clackamas School District Gymnasiums,
Clackamas County, OR
6,000-sf gymnasium addition at four schools, plus four classroom additions and 4,000-sf covered play area; one-story wood frame construction at classroom addition. Gymnasiums have tilt up concrete walls with exposed gabled steel roof trusses and steel roof decking.
Tualatin High School-Swimming Pool Addition, Tualatin, OR
16,000-sf swim center addition to 1990 high school project. Steel framed roof, 95-foot span over pool. Concrete masonry walls.
Tualatin High School-Auditorium Addition, Tualatin, OR
An 18,000-sf theater addition to 1990 high school project consisting of a stage with fly loft, approx. 60-ft in height, concrete tilt up walls and steel framed roof at house and stage, with wood studs and roof at lobby.
New Elementary School on Beef Bend Road
74,250-sf new elementary school, with two 70-ft structural steel truss between gym and cafe. Concrete tilt up panels at gym, cafeteria and kitchen. Administration/library section with curved ends, hip roof and three 20-inch concrete columns
Hermiston Middle School,
Hermiston, OR
Approximately 90,000-sf one-story building. Wood frame walls with steel roof system, steel joist and steel deck. Exposed joists and Tectum deck cafeteria and library, 4x4 tube purlins. Tilt up concrete walls at gymnasium with exposed steel joists (94foot span) and steel deck.
Hazelbrook Middle School, Tigard, OR
104,000-sf middle school building. One-story wood frame construction with brick veneer. Concrete tilt-up walls at gymnasium with a heavy timber roof, I joist roof elsewhere.
St. Helens Elementary School, St. Helens, OR
Approximately 81,000-sq ft 1-story wood frame construction with 3 to 12 roof pitch at classrooms, 30-ft span I-joists. Tilt-up concrete walls with glue lam beams & wood joists at gym and cafe. 80-ft structural steel truss between gym and cafe.
Chehalem Valley Middle Elementary School, Newberg, OR
Approximately 85,000-sq-ft, two-story, wood-frame construction with brick veneer, and I-joists at floors and roof. Tilt-up concrete walls with custom steel trusses (82-ft span) at gymnasium, exposed steel deck
Return to Top
|
|