Addison-Wesley Publishing Company, Menlo Park, CA
Two identical office buildings, two stories in height, with a total square footage in excess of 80,000 square feet. The structural system is a combination of structural steel and wood frame.
Adobe Headquarters Building, Phase I, San Jose, CA
Six-level (two below grade), 440,000 square foot garage with parking for 950 cars. Structural system consists of concrete fill over metal deck spanning to wide flange steel beams supported on wide flange steel columns. The lateral load resisting system utilizes steel braced frame and moment frames. The foundation system is a monolithic concrete mat.
Adobe Headquarters Building, Phase II, San Jose, CA
Six-level (two below grade), 330,000 square foot garage with parking for 850 cars. Structural system consists of concrete fill over metal deck spanning to wide flange steel beams supported on wide flange steel columns. The lateral load resisting system utilizes steel braced frame and moment frames. The foundation system is a monolithic concrete mat.
Adobe Headquarters, San Jose, CA
Phase I Seventeen-story office building with two basement and four above-grade parking levels; grade level entry, including fountain, entry area, landscaping and walkways, for a total square footage of 850,000 square feet.
Phase II A 17-story, steel frame office building, which has two basements. The basements, plus the first five levels (excluding level 2) will be used for parking; level 2 and levels 6 through 15 are office space. The project has a total of 655,000 square feet.
Phase I, Building II A 17-story, steel-frame office building with parking for a total area of 484,317 square feet; there will also be an addition to the exterior area of Level 6 of Phase II, plus a bridge to Phase I at Level 13.
Alamo Square Apartments, San Francisco, CA
This project consists of approximately 41,000 square feet of parking in a partial basement, over which a concrete deck is placed as a base and podium for a four-story, wood frame apartment structure of approximately 102 apartment units.
Albany Bayview Office Park, Albany, CA
The project consists of three, three-story office buildings, with each building having one level of parking below grade. Each office building has 75,000 square feet of office space and 25,000 square feet of underground parking, for a combined total of 225,000 square feet of office space and 75,000 square feet of parking.
Aldea Housing, San Francisco, CA
A 140,000 square foot project comprised of approximately nine structures varying in height to three stories. Utilizing Type V, wood-frame construction has optimized the project construction.
Amangani, Jackson Hole, WY
This very high-end hotel is built on a hilltop with commanding views of the Grand Tetons. This structure is a four-building structure consisting of a poured-in-place concrete garage, 4-story, steel frame public space structure and two 4-story hotel guest room structures designed using both poured-in-place concrete and wood frame construction. This part of the country is seismically active and required the structure to be designed. The total square footage is 100,000 square feet, with an estimated construction cost of $18,000,000
http://www.jackson-hole-luxury-real-estate.com/amangani/index.htm
Amanlodge, Jackson Hole, WY
One-level, 14,000 square foot garage with parking for 85 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral-load resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Atascadero State Hospital, Atascadero, CA
32,000 square foot addition to existing mental health facility; concrete/concrete block.
Total Project Cost: $4.5 million.
Atascadero State Hospital Wards Addition, Atascadero, CA
New multipurpose building at existing mental health hospital facility; 43,000 square foot, steel frame and concrete block structure. Total Project Cost: $6 million.
Avalon Towers, 388 Beale Street, San Francisco, CA
Five-level, 135,000 square foot garage with parking for 271 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
AvalonBay Communities Mission Bay,
Block N2, Parcel 3, San Francisco,
San Francisco, CA
This housing project contains a 15-story concrete housing tower, a three-story, wood frame housing component, and two levels of partially depressed parking.
Baner Building, San Mateo, CA
This Senior Housing project will include two 4- to 5-story residential buildings over a below-grade parking garage. The approximate gross square footage of the garage is 38,5000 square feet and the residential buildings are approximately 22,500 square feet and 5800 square feet, respectively.
Bard College/F.W. Olin Language Center, Annandale-on-Hudson, NY
Two-story addition to F.W. Olin Humanities Building; has partial basement and one-story connection between the new addition and Humanities Building. Structure designed using structural steel frame; supported floor concrete on metal deck; roof utilizing rigid insulation.
Bard College/Bard Campus Center, Annandale-on-Hudson, NY
This project was the design of a Campus Center on the Bard College Campus in upstate New York.
Bay Meadows Mixed-Use Site, Foster City, CA
This mixed-use project contains a subterranean parking structure of approximately 9000 square feet. In addition, two levels of elevated parking have been added to the project. Each of these elevated levels of parking is approximately 26,000 square feet.
Bay Meadows Mixed Use, San Mateo, CA
This project consists of the full development of the mixed-use site at Bay Meadows. In its current configuration, the seven-acre site will contain five new buildings and a subterranean parking structure. At least four of the five buildings will rest on a podium with the parking underneath. In addition to the buildings, the majority of the complex sits on a podium level slab, which supports the structures, the at-grade parking and the landscaping. The square footage for this project is 246,500 square feet.
Bay Park Plaza II, Burlingame, CA
This structure is a five-story office building with a floor plan of approximately 22,000 gross square feet, with a total square footage of approximately 110,000 square feet. This building is designed using structural steel for the framing system, with the floor being designed using metal decking with concrete fill. The lateral system will be eccentric steel braced frames in combination with steel moment resisting space frames.
Bay Towers, 388 Beale Street, San Francisco, San Francisco, CA
This housing complex consisting of two, mirror image16-story towers emerges from a four-level parking and retail podium base.
Bayside Plaza, San Francisco, CA
An eight-story, 100,000 square foot office building and parking structure of reinforced concrete.
Baywood Condominiums, San Mateo, CA
Baywood Condominiums is a three-story, wood-frame structure, which rests on a concrete podium. Below the podium slab and also below-grade is a parking level.
BEA Software Systems, San Jose, CA
The first phase of this development will be two office buildings, a training facility and a parking structure. The office buildings will be six stories and 222,000 square feet, and five stories and 168,000 square feet, respectively. The training facility will be two stories in height, enclosing approximately 20,000 square feet and be attached to the parking structure, which is anticipated to be four stories in height and have an enclosed area of 490,000 square feet.
Becton-Dickinson Laboratory/Office, San Jose, CA
Renovation and addition to a 320,000 square foot facility for new laboratory, manufacturing and office use. Addition totaled 60,000 square feet, including new mezzanine, in seismically upgraded warehouse space for laboratory use. Steel frame structure with concrete fill over metal deck at the elevated floor level. Total cost of $20 million; completed 1990.
BEQ Restoration, Agana, Guam
Rehab of existing dormitories.
Bernal Corporate Park, Pleasanton, CA
A six-building complex; two being two-story, tilt-up, concrete structures, 35,000 and 40,000 square feet, respectively. Four office buildings, two of which are three stories in height, with a total square footage of 220,000 square feet. The other two office buildings are up to five stories tall and have a total square footage of 250,000 square feet.
BODO Development, Hotel and Parking Garage, Boise, ID
A project consisting of a seven-story hotel over a four-story parking structure. The hotel lobby, support space and retail use will be on the ground floor.
Borelli Residence, Saratoga, CA
This new, single-family residence will be two stories in height with a basement and contain approximately 8150 square feet
Brandeis Hillel Day School, San Francisco, CA
This project consisted of the construction of a new, two-story Library Wing consisting of 24,000 square feet. In addition to the new Library Wing, this project also included a new retaining wall, the elimination of a portion of the existing classroom wing, and reconstruction of the Arcade running parallel to the northeastern elevation due to dry rot.
Brannan, The, 233 Brannan Street, San Francisco, CA
Five-level (two below grade), 155,000 square foot garage with parking for 350 cars. Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Brannan Square, San Francisco, Ca
A four-lot project consisting of loft housing over parking; rehabilitation of two existing four-story buildings, one having an addition of one story of loft housing; new construction of four to five stories of housing over parking. Total square footage is approximately 400,000 square feet.
Brannan Towers, Phases I, II, III, San Francisco, Ca
A project consisting of two basement levels of parking with two retail/public podiums above grade; springing out of the podium are three condominium towers, 17 stories tall.
Bridgeview Towers, 400 Beale Street, San Francisco, Ca
A 28-story, condominium project, with parking located in two basement levels and the first two levels above grade.
Broadway Pointe, Walnut Creek, CA
Four-level, 85,000 square foot garage with parking for 285 cars, the first level of which contains retail space. Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is conventional spread footings.
Cal Pacific Building, San Francisco, CA
Structural Steel & brick walls; 1st historic high-rise rehab in San Francisco. New foundations, new vertical & lateral load system.
California Casualty Building, San Mateo, CA
Seismic upgrade of a two-story, steel frame structure setting on post-tensioned concrete slab. Area: 300,000 S.F.
California School for the Deaf, Fremont, CA
This 75,000 square foot school for the State of California was valued at $16,000,000.
Caswell Coffee, 642 Harrison Street, San Francisco, CA
Concrete building; seismic upgrade new mezzanine & penthouse.
Chehalem Valley Middle Elementary School, Newberg, OR
Approximately 85,000-sq-ft, two-story, wood-frame construction with brick veneer, and I-joists at floors and roof. Tilt-up concrete walls with custom steel trusses (82-ft span) at gymnasium, exposed steel deck.
Childrens Day School, San Francisco, CA
This first phase of project consists of a new, two-story classroom building with a partial basement and modifications to the existing building for accessibility. The second phase will be the larger renovation to the existing building.
Children's Hospital Addition, Oakland, CA
Three-story addition consisting of approximately 10,000 square feet, utilizing reinforced concrete and wood-frame construction. Estimated construction cost of $1,000,000.
Children's Hospital Renovation, San Francisco, CA
This project was the total renovation of Children's Hospital, currently known as the California Campus of the California Pacific Medical Center. The work consisted of removing several wings, seismically upgrading and modifying for current standards. The approximate square footage was 100,000 square feet.
Channel Park Condominiums, Mission Bay, San Francisco, CA
A seven-story condominium project, which will includes 100 residential units and an enclosed parking garage for 101 cars for a total square footage of approximately 150,000 square feet.
Christiania, The, Ketchum, ID
This mixed-use project consists of approximately 54,425 square feet in three levels. The at-grade level will be mixed-use of either parking or retail space; the second floor will be commercial office space, with residential units on the third floor.
Cinnabar Commons, San Jose, CA
This project is a housing complex with parking. The overall structure is three and four stories in height with a partial basement, which will be used for parking. The project contains two separate podium level structures separated by a private drive. The spaces below the Podiums will be used for parking, with wood frame structures atop the podium levels for housing components. The total project is approximately 350,000 square feet.
Cisco Systems, San Jose, CA
Site II A four-story, steel frame building containing an auditorium and cafeteria; two three-story office buildings; a two-story building utilizing tilt-up concrete walls, steel bar joists and concrete over metal deck floor for a total square footage of 1.2 million square feet.
Site III A series of buildings tilt-up, concrete structures including trash enclosures, loading docks, landscape features, screen walls and mechanical equipment spaces on roofs. Total square footage for this project is 750,000 square feet.
Site IV, Phases I & II Phases I, and II consist of seven office buildings, four being three stories in height; the other two buildings are four-story structures. Total square footage for this project is 3.5 million square feet.
Site V Site 5B consists of five office building. All of these buildings are three stories in height, each having a gross square footage of 250,000 square feet. All buildings of this phase of the site development are anticipated to be designed using structural steel with metal deck and concrete fill.
Site VI This site will contain ten office buildings, seven of which will be built in the first phase of this project. The seven structures, buildings 26 to 32, will vary in height from three to five stories, with the three sets of buildings being duplicates of one another.
Site VII The plan for Site VII identifies a site containing approximately 42 office buildings and an unknown number of parking structures. Phase A of this project will contain six office buildings, varying in height from two to six stories, and one parking garage of at least two stories.
Site VIII This project is anticipated to be a continuously phased project, ultimately containing 18 buildings. It is anticipated that there will be four basic building types ranging in size from three stories containing 150,000 square feet; four stories containing 200,000 square feet; five stories containing 250,000 square feet, and six stories containing 300,000 square feet
Civic Plaza Condominiums, San Francisco, CA
Three-level, below-grade, 60,000 square foot garage with parking for 135 cars.
Structural system consists of a cast-in-place, two-way concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Club One Fitness Clubs, Citicorp Center, Embarcadero Center,
San Francisco, CA
These projects included remodel and renovation of existing facilities for new fitness clubs, including aerobics areas, exercise equipment and full service locker rooms.
CM-One Mixed-Use Building, Los Gatos, CA
A two-story, 6000 square foot building with a full basement; the intended use of the building is one level of office space and one level of residential units.
Concar Drive Offices, San Mateo, CA
This project consists of two office buildings, each of which are five stories in height and contain a total of 205,000 square feet of space.
Concar Parking Garage, San Mateo, CA
The ConCar parking garage is a two-level structure that will contain approximately 663 cars. In addition to the parking deck, there will also be a loading dock and associated ramps.
Concordia Club of San Francisco, San Francisco, CA
The Concordia Club is an established athletic facility in San Francisco that was damaged during the 1989 Loma Prieta Earthquake. We are in the process of retrofitting the building to comply with the current seismic codes of San Francisco. In addition, during the seismic upgrade the natatorium and the remainder of the club will undergo alteration.
Cowell Hall Classroom University of San Francisco,
San Francisco, CA
This project included rehabilitation of an existing four-story with basement, concrete building, which enclosed approximately 38,000 square feet. There was also an addition of six (6) new classrooms at the existing level floor roof deck, with a total enclosed area of approximately 48000 square feet.
Crossing, The, San Bruno, CA
This project consists of three different structures, a five-story Apartment Building, a Parking Structure six stories high and a Recreation Building of two stories. This structure has approximately 400,000 square feet of housing and 150,000 square feet of parking for 450 units.
Cupertino City Center, Cupertino, CA
Structural steel and concrete office buildings and parking structures; one four-story building contains 140,000 square feet and the two eight-story buildings each containing 400,000 square feet.
Dalles Middle School, The Dalles, OR
95,000-sf two-story concrete and steel frame construction with pitched roofs; 95 by 135- foot gymnasium with 38-ft tall tilt up concrete walls. Floor system steel beams (37-ft span) with steel deck plus concrete slab. Roofs are steel joist and deck roof framing is exposed in gymnasium and commons.
Del Monte Center Garage Addition, Monterey, CA
This garage addition will consist of a two-level (one elevated level) parking deck addition to the existing parking structure, though separate from the existing structure.
Desert Princess Resort, Cathedral City, CA
Four-story, 300-room hotel and convention center; concrete, CMU and steel construction. Estimated construction cost $25 million.
Donald R. Bren Campus Events Center
University of California Irvine,
Irvine, CA
This project is a 6000-seat, 75,000 square foot, steel frame arena, featuring 200 feet by 200 feet clear span roof structure.
Downtown Sunnyvale Parking Garage, Sunnyvale, CA
Four-level, below-grade garage of 710,000 square feet with parking for 2185 cars. Structural system consists of a cast-in-place, two-way concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is a monolithic concrete mat.
Eagle Valley Junior High School, Carson City, NV
The structure is designed using steel and wood and is approximately 78,000 square feet.
Echelon Campus, San Jose, CA
This two-phase project consists of a three-story office building, with a total square footage of 75,000 square feet. Phase II will be a three-story, 75,000 square foot office building that will be a mirror image of the structure built for Phase I.
Electronic Arts Commons Building, Redwood City, CA
This 47,000 square foot, steel frame recreation and fitness center was designed specifically for the employees of Electronic Arts Corporation. The project is two stories in height. At one end of the facility is a basketball court; the other space is filled with a weight-training room, aerobics rooms, locker rooms, and a dining facility.
Electronic Arts Complex, Phases I and II, Redwood Shores, CA
Phase I is a four-building complex consisting of one, eight-story office building, approximately 260,000 square feet; one, six-story office building, approximately 150,000 square feet; one, two-story commons building, approximately 50,000 square feet, and a four-story, 874-car parking structure of approximately 260,000 square feet.
Phase II is a three-building complex consisting of one four-story office building containing approximately 320,000 square feet, one four-story parking structure of approximately 260,000 square feet and a one-story, freestanding auditorium building of 11,000 square feet.
Electronics for Imaging Campus, Foster City, CA
The first phase of this project was a five-level parking structure with a total parked-on are of 339,500 square feet; the second phase is a five-story building enclosing approximately 163,000 square feet with a 15600 square foot enclosed penthouse; the third phase is a six-story, 172,000 square foot office building, with a 9500 square foot enclosed penthouse.
Electronics For Imaging, Foster City, CA
Six-level, 300,000 square foot garage with parking for 1190 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Ellis at Middlefield, Mountain View, CA
A three-story office building of 99,977 gross square feet, and a four-story office building of 134,887 square feet. This structure is concrete fill over metal deck floors, and roofs supported on wide flange beams and columns. The foundation is shallow spread footing. In addition, there will also be an arcade at the front of each structure.
Emery Residence, Sugar Bowl, CA
This single-family dwelling of approximately 5900 square feet is a two-story, wood frame structure, with the first level on grade and the second floor and roof being constructed predominantly out of wood frame.
Exodus/S3 Campus, Santa Clara, CA
Two, four-story buildings, approximately 150,000 each, and two, eight-story buildings enclosing 180,000 square feet each, and a commons building of 40,000 square feet for a total of 760,000 square feet, built in two phases, Type I construction utilizing concrete fill over metal deck, and structural steel frame.
Fairmont Hotel, San Francisco, CA
Facade Renovation and complete replacement of parapet and cornice.
http://www.fairmont.com
Fairmont Hotel, San Jose, CA
Twenty-two story steel frame hotel; 700,000 square feet. Mixed-use project includes hotel, retail, convention facilities and subterranean parking. Estimated construction cost $65 million.
Fairmont Hotel Expansion, San Jose, CA
One building, 13 stories tall with three basement levels for parking; at-grade level for Lobby and retail space; second floor for meeting rooms, athletic space and back-of-house space; remaining 11 floors are guest rooms. In addition to the structure, the building is anticipated to have an underground connection to the existing Fairmont Hotel, as well as a bridge connection at the second floor, which will be above and below the Paseo.
Falletti Plaza, San Francisco, CA
This structure has the lowest level and ground level predominantly used for parking, with a portion of the ground level having retail space. Above the first level there are three levels of wood-frame apartments.
Fireman's Fund Complex, Novato, CA
Over 500,000 square feet of office building in two structures. Buildings were designed using structural steel and are four stories in height.
Fishermans Wharf Hotel, San Francisco, CA
This project consists of a four-story hotel building over one basement of parking, with a total square footage of 162,400 square feet.
Fontana East Corporation, San Francisco, CA
This is a condominium project located at North Point Boulevard and Van Ness Avenue. It is an 18-story reinforced concrete building with underground parking, covering 200,000 square feet. Originally built in 1963, the Owners of the building have retained us to provide documents to seismically upgrade the structure to current codes.
Foundry Square, Buildings 1, 2, 3 and 4, San Francisco, CA
This project will be located on the four corners of the intersection at First & Howard Streets. Building 1 is a ten-story office building with two basement levels of parking and a landscaped area.
Building 2 will also be ten stories in height with two basements to be used for parking. This structure will have a landscaped plaza area on the ground floor and on the First Street elevation will wrap around an historic landmark building. This historic building will be rehabilitated during the project.
Building 3 will be a nine-story office building and Building 4 will be a ten-story office building. Both will have one basement level for parking. The ground floor and eighth floor of both buildings will have landscaped plazas associated with them.
Fountain Park Office Buildings, Mountain View, CA
This project consists of a new four-story office building enclosing approximately 102,500 square feet. The structural system for this building is anticipated to be structural steel with concrete fill over metal deck floors. The other part of this project is exterior renovations of an existing one-story office building.
Four Seasons Hotel, Jackson Hole, WY
This project comprises several buildings and will be built on various levels. The initial concept calls for a hotel portion, a portion for condominium/time-share use, and a parking structure. The hotel portion could be as tall as nine stories, the condominium portion as tall as five stories, with the parking structure three stories in height.
Four Seasons Resort, Vale, CO
This project is a ten-story structure with three levels being below-grade. The defined uses of the structure are a full-service hotel with a ballroom, fractional ownership units, condominiums, employee housing and below-grade parking.
Franklin Templeton Headquarters, San Mateo, CA
This is a nine-building project, which will also include trash enclosures, loading docks, landscape features and mechanical equipment space. The nine buildings include a one-story warehouse with loading dock; two three-story, 120,000 office buildings over a one-level subterranean garage; two four-story, 160,000 square foot office buildings over a subterranean garage, two four-story, 120,000 square foot office buildings over a subterranean garage, and a two-story, 60,000 office building.
Fulton @ Masonic, San Francisco, CA
This is a project containing 130 residential units in 2- and 3-story Type V construction, with below-grade parking and two levels of above-grade parking; retail space is also included. This project consists of approximately 150,000 square feet of housing; 75,000 square feet of retail and 140,000 square feet of parking.
The Gap Parking Structure, San Bruno, CA
Five-level, 252,000 square foot garage with parking for 750 cars.
Structural system consists of one-way cast-in-place post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
The Gap, Phase II, San Bruno, CA
This project consists of two, new, two-story office buildings (Buildings 2 and 3) enclosing approximately 289,000 square feet and a new parking structure below Building 3 of approximately 280,000 square feet.
Gates Computer Science Building Stanford University,
Palo Alto, CA
Five-story, steel frame structure designed to serve as a faculty office building, research and teaching facility. Construction cost $24,000,000.
Glascock Street Housing, Oakland, CA
Glascock is a four-story condominium structure placed over a concrete deck base and podium, which were over a partial basement of parking.
Golden Gate Produce Terminal, South San Francisco, CA
Repair of structure following October 17, 1989 earthquake; installed ties, beams to concrete walls; installed new wood posts to supplement cracked concrete pilasters. Area: 126,000 S.F.
Grants Pass High School, Grants Pass, OR
Two story, 200,000-sf steel frame high school with performing arts theatre, arena style gymnasium and football grandstand.
Grants Pass High School - General Structural Evaluation,
Grants Pass, OR
Seismic evaluation of this existing multi-building campus totaling 190,000-sf, constructed over a 100-year period. Originally constructed as a single building in 1988, the high school campus currently is comprised of more than nine buildings.
Green Valley Corporate Center, Fairfield Business Park,
Fairfield, CA
This project consists of two, three-story, tilt-up concrete buildings, each of which is approximately 100,000. If required, trash enclosures, loading docks and landscape features will be included.
Gresham-Barlow School District,
District-wide Seismic Evaluation,
Portland, OR
Seismic Risk Analysis of 16 existing school facilities for the Gresham-Barlow School District. The study involves building evaluations, damage estimates, strengthening schemes, cost estimates and presentation of the results to the public.
Hall of Justice Addition, San Francisco, CA
Structural steel frame addition, six stories in height. Approximately 57,000 square feet.
Total project cost: $8,000,000.
Hazelbrook Middle School, Tigard, OR
104,000-sf middle school building. One-story wood frame construction with brick veneer. Concrete tilt-up walls at gymnasium with a heavy timber roof, I joist roof elsewhere.
Healdsburg High School Renovation, Healdsburg, CA
Renovation and reconstruction of approximately 82,000 square feet of the existing high school building, including construction of eight new classrooms in existing covered arcade areas and remodel of existing vocational arts building, as well as a new 12,000 square foot cafeteria/multi-purpose building.
Hermiston Middle School,
Hermiston, OR
Approximately 90,000-sf one-story building. Wood frame walls with steel roof system, steel joist and steel deck. Exposed joists and Tectum deck cafeteria and library, 4x4 tube purlins. Tilt up concrete walls at gymnasium with exposed steel joists (94foot span) and steel deck.
High Tech/Multimedia Complex,
First & Howard Streets, San Francisco, CA
This 1.25 million square foot project consists of four, ten-story, poured-in-place concrete buildings with underground parking.
Hillview/Hanover Office Buildings, Palo Alto, CA
This project includes two new, two-story, 76,500 square foot office buildings, which will be mirror images of each other. The structural system is concrete fill over metal deck floors supported on wide flange beams and columns, with a foundation system of shallow spread footings.
Hilton Hotel, San Francisco, CA
This project in its entirety encompasses a city block. On it are four distinct buildings ranging in height from 42 stories to six stories. Our most recent task was to design a new 22-story guest room tower and a new 30,000 sq. ft. ballroom. This required clear spans in excess of 120 feet. The ballroom spanned two separate structures, which demanded a complete rehabilitation of an existing structure to support loads in excess of 350 pounds per sq. ft. The cost of the project exceeded 230 million dollars and is the largest hotel in California.
Hilton Hotel Tower II Addition, San Francisco, CA
Twenty-two story, steel frame guest room wing and remodel of existing hotel. In addition to the hotel tower, this complex housed a column-free ballroom of 25,000 square feet. Project was complicated by having spans over the ballroom of 120 feet in length, which in some cases were also required to support the 22-story guest room wing on top. Estimated construction cost for total project $180 million.
Hilton Hotel, Santa Clara, CA
This project consists of an eight-story hotel building having a total enclosed area of approximately 166,066 square feet.
Holiday Inn, Emeryville, CA
Twelve-story reinforced concrete building supported on pre-cast concrete piles.
Hotel Camelot, 124 Turk Street, San Francisco, CA
Seismic rehabilitation of six-story un-reinforced masonry building; installed new lateral system using steel braced frames. Area: 18,000 S.F.
Hyatt Grand Champions Resort, Indian Wells, CA
This project contains five different structures: Ballroom Expansion Building; Guest Room Wing; Casitas/Presidential Suites; Pool Bar Restaurant and the Spa. The Ballroom Expansion Building is a one-story, column-free, long-span building; the Guest Room Wing is five stories in height, and the Casitas, Restaurant and Spa are all one story each
Hyatt Regency Gainey Ranch, Scottsdale, AZ
Four-story, 400,000 square foot, luxury resort hotel; reinforced and post-tensioned concrete. Estimated construction cost $35,000,000.
Innisfree Condominiums, San Francisco, CA
This project located at California and Leavenworth Streets in San Francisco, is a six-story, post-tensioned reinforced concrete structure, which also includes two levels of basement parking.
Inns on the Colonnade, Sun Valley, Ketchum, ID
This project is of wood frame construction and contains approximately 52,000 square feet of structure on three levels. The at-grade level consists of mixed use of parking and retail space; both the second and third floors are residential units. The third floor is loft space for some of the residential units.
Irvington Town Center, Fremont, CA
This project consists of four buildings of Type V construction. They are two retail buildings of 7000 and 38,000 square feet, respectively; one restaurant building and one 60,000 square foot building of housing in three stories, over 20,5000 square feet of retail and 35,000 square feet of parking in Type I construction.
Irwin Memorial Blood Bank, 270 Masonic Avenue,
San Francisco, CA
Seismic rehabilitation of a two-story, reinforced concrete structure, built in two phases during the 1950s and 1960s. In addition to installing new concrete shear walls, additional second floor space was created over part of the project and the Auditorium was converted into two floors of laboratory space. Total area: 45,000 square feet.
Island Park Campus, Belmont, CA
Phase I consisting of a five-story, 107,000 square foot office building and a three-story, 110,000 square foot parking structure.
Phase II will be a seven-story, 160,000 square foot office building. The structural system will be concrete fill over metal deck, supported by a structural steel frame for the office buildings and cast-in-place and precast concrete for the parking structure.
Island Park Campus, Belmont, CA
Three-level, 100,000 square foot garage with parking for 320 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Jackson Courtyard Apartments, Oakland, CA
This new eight-story, cast-in-place concrete residential apartment building will have two levels of parking and commercial/retail space at the first two floors.
Jackson House, 700 Sansome Street, San Francisco, CA
This will be a six-story, mixed-use project that will include parking and retail on the ground floor, offices on the second and third floors and housing on the fourth, fifth and sixth floors.
Jacobs Crossing, Bozeman, MT
A new three-story, 41,000 square foot, mixed-use project that will house retail, office and residential. The building will be of steel frame construction, with a combined braced and steel moment frame as the lateral force resisting system.
JMA Office Building, Los Altos, CA
This project is a two-story, wood-frame office building of approximately 20,400 square feet.
Kaiser Hospital, Richmond, CA
New acute care hospital; 3-story, 75,000 square foot, steel frame structure. Total Project Cost was $25 million
Kaiser Permanente Hospital, Santa Teresa, CA
Installation of ADAC equipment; investigation of existing seismic restraints for non-structural components, and review of proposed connections for bracing of existing oxygen and vacuum lines and fire sprinkler pipes.
Karen Keshet Jewish High School, San Francisco, CA
This is a multiple-phased project of which the renovation of the existing two-story structure is the first phase. The renovation is to take place after the existing buildings comply with the current code provisions necessary to convert to a private high school.
Kendrick Hall University of San Francisco School of Law,
San Francisco, CA
New addition & interface; rehab existing structure. Steel frame and concrete structure, approximately 12,000 square feet.
Leavitt Residence, San Francisco, CA
This single-family, designed by world acclaimed Architect, Robert Stern of New York, utilizes both plywood shear walls and steel moment-resisting frames for its lateral system.
Lofts at Albert Park, San Rafael, CA
This project consists of approximately 41,000 square feet of parking in a two-level structure adjacent to a three-story, wood frame apartment structure, which contains approximately 117 apartment units for a total of 91,000 square feet.
Lofts at Lake Street, Pasadena, CA
The Lofts residential housing complex is an overall structure of six stories above grade and two levels of below-grade parking.
Los Medanos Health Center, Pittsburg, CA
Another project consisting of various components such as the Psychiatric Ward; new audio booth; new x-ray equipment and work on equipment room 1083, drawings and review necessary for installation of a chain link fence enclosure over to existing roof to level the floor.
Lytton Building, Palo Alto, CA
This 60,000 square foot, steel frame office building is three stories in height and has two basements for parking.
http://www.ksha.com/commer/8/red.htm
Magnolia Place, San Francisco, CA
This project is a mixed-use complex, which contains retail, apartment units and parking. The overall structure is three stories in height with the basement being used for parking, the first floor used predominately for retail, and the next two levels for housing. Two-level, 20,000 square foot garage with parking for 50 cars. Structural system consists of a cast-in-place, two-way concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Marin County Correctional Facility, San Rafael, CA
Two-story, reinforced concrete and concrete masonry block, 250-cell me3dium security prison with 250,000 square feet of structure.
Marin Lofts, San Rafael, CA
This project is a split-level, below-grade parking structure, with a podium level deck above forming the base for fifteen loft units. These lofts are three levels in height. The podium level is of poured-in-place concrete construction, with the loft units of wood frame construction.
Marin Lofts, San Rafael, CA
One-level, 16,000 square foot garage with parking for 45 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Market & Noe Center, San Francisco, CA
This is three-story, reinforced concrete building containing 30,000 square feet; used as office, retail and parking.
Marlin Cove Retail Center, Foster City, CA
The overall structure of this project is predominately one story in height, except for an area where it is two stories in height. In addition to the new construction, there is also a modification to the existing supermarket entry.
Marriott Hotel, Burlingame, CA
This project is an eleven-story, 600-room, concrete and steel structure. The top story of one of the hotel wings has a 15,000 square foot ballroom. The roof of the ballroom spanned in excess of 85 feet and was designed using steel construction.
Marriott Hotel, Emeryville, CA
Eleven-story hotel designed utilizing ductile moment resisting concrete frames and post-tensioned concrete slabs. Site is founded on San Francisco Bay mud, therefore requiring a supported slab-at-grade and concrete pile, with lengths up to 140 feet. In addition to the hotel, the project also consists of two low-rise, commercial buildings designed utilizing steel frame construction. Total square footage of hotel is 160,000 square feet and 25,000 square feet of retail space.
Marriott Hotel Great America, Santa Clara, CA
Sixteen-story guest room addition to the original hotel estimated to be 250,000 square feet; designed using poured-in-place concrete construction. In addition to the guest room tower, we added a significant amount of back-of-house space. Two-level, 85,000 square foot garage with parking for 250 cars. Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Marriott Hotel Yerba Buena Gardens, San Francisco, CA
Thirty-eight story, steel-framed, 1500-room convention hotel. The project includes a 110,000 square foot underground ballroom structure. The 40,000 square foot ballroom has a 140 foot clear span supporting future construction and garden loads of 375 pounds per square foot.
Masonic Hall, 2669 Mission Street, San Francisco, CA
Seismic upgrade of existing four-story, with basement, un-reinforced masonry structure, which included two large meeting halls above existing retail space. Lateral load-resisting system included strengthening of existing walls with shotcrete and installation of steel braced frames.
Merrithew Hospital, Martinez, CA
Various projects were performed for this medical facility including, a new two-story structural steel Laboratory Building, containing approximately 16,000 square feet; work on the Pathology Lab, Ward E; Surgery room; Ward 1 Bathroom renovation
Mid-Peninsula Jewish Community Center Day School, Palo Alto, CA
The first phase of this three-phase project is Classroom Building #1 and the garden area associated with it. The classroom building is a two-story structure over a full basement.
Milwaukie High School Renovation, Milwaukie, OR
Major remodel and incremental seismic upgrade of existing 2 story high schools. Existing building constructed in several phase from 1919 to 1949 plus minor remodels since. Concrete exterior walls, wood framed interior walls, floors and roof. Upgrade involved addition of wall anchorages, drag strut ties to existing concrete walls and addition of interior concrete block shear walls. Included reinforcement of existing walls with composite fiber reinforcement.
Mission Bay, Block N3, Parcel 2, San Francisco, San Francisco, CA
The overall structure is fifteen stories with the lowest three levels being used predominantly for parking, but also having housing units on the perimeter of the structure. The fourth level of the structure contains housing and a large outdoor space with a swimming pool for the tenants. The building then steps back two more times at levels 7 and 9.
Monterey County Detention Center, Salinas, CA
Addition and alteration to existing detention center; 2-story, 7,000 square feet, reinforcedconcrete masonry-bearing walls.
Total Project Cost: $1 million.
Monterey Peninsula Hotel, Monterey, CA
This project consists of three structures. The four-story main hotel building is on the bay side of Cannery Row; a four-story Guest Complex and three-story parking structure are tiered on the hillside directly across Cannery Row. The construction for this project is poured-in-place, post-tensioned concrete. The main hotel building, room wing annex and the parking garage comprise a total of 316,000 square feet.
Mt. Hood Main Academic Building,
FEMA 178 Seismic Evaluation,
Gresham, OR
Seismic evaluation of a two- to three-story, multi-building academic facility; reinforced concrete construction built in phases between 1968 and 1981.
Mountain Inn, Big Sky, MT
A new 68,000-square foot, four-story, 89-room mountain hotel. The building is situated at the base of a major ski run, and features wood frame construction, a large porte-cochere and high-mountain snow loads. Big Sky, Montana is located not far from Yellowstone National Park and is in UBC Seismic Zone 4.
Navy Brig, Treasure Island, CA
This structure consisted of using concrete block, reinforced concrete and structural steel. Total square footage for this two-story structure is 30,000 square feet.
Construction cost for the project was $4,500,000.
Network Appliance Campus, Sunnyvale, CA
This project consists of two three-story office buildings, Buildings 5 and 6, consisting of 125,516 and 123,287 square feet, respectively; one two-level parking structure adjacent Building 6. This project also includes tenant improvements to existing buildings at 495 Java Drive, 1260 Crossman Way and 1275 Crossman Way. Buildings 7 and 8 are three-story office buildings of 123,287 square feet each, essentially identical to Building 6, and the EMI Building is one story containing 3840 square feet.
Network Appliance, Building 6, Parking Structure, Sunnyvale, CA
This phase of the Network Appliance project consists of a two-level parking structure adjacent to Building 6. The structure is long-span, cast-in-place concrete.
New Elementary School on Beef Bend Road
74,250-sf new elementary school, with two 70-ft structural steel truss between gym and cafe. Concrete tilt up panels at gym, cafeteria and kitchen. Administration/library section with curved ends, hip roof and three 20-inch concrete columns.
Next Level Communications Office Building,
Rohnert Park, CA
Two-story office building of 140,000 square feet. This building is designed utilizing structural steel construction; vertical load-carrying system is a combination of rolled and fabricated steel trusses; lateral system is a series of eccentric braced frames; floor is a metal deck with concrete fill on second floor and metal deck with rigid insulation on the roof.
Next Level Communications, Phase II, Building 5, Rohnert Park, CA
Consisting of 100,000 square feet, this new, three-story office building will be built over a one-level, below-grade garage enclosing approximately 35,000 square feet.
North Clackamas School District Gymnasiums,
Clackamas County, OR
6,000-sf gymnasium addition at four schools, plus four classroom additions and 4,000-sf covered play area; one-story wood frame construction at classroom addition. Gymnasiums have tilt up concrete walls with exposed gabled steel roof trusses and steel roof decking.
Notre Dame Inn Notre Dame University, South Bend, IN
A four-story, full service hotel including kitchen, back of house and a ballroom, with public areas of the hotel being one and two stories in height. The public areas will include lobbies, restaurant, ballroom, back-of-house uses and one outside lanai that will require a supported slab. Approximately 250,000 square feet of poured-in-place concrete and structural steel construction.
Notre Dame Inn, South Bend, IN
In its current configuration, this hotel project on the campus of Notre Dame College is a full service hotel including kitchen, back of house and a ballroom. The structure is potentially four stories in height and contains a gross square footage of 221,000 square feet. In addition, the public areas of the hotel are one and two stories in height; these areas include lobbies, restaurant, ballroom, back-of-house uses and one outside lanai that will required being a supported slab. The hotel also features a highly articulated roof.
Oakland Airport Hilton, Oakland, CA
A three-story, wood-frame hotel containing 350,000 square feet.
Oakland City Center, Oakland, CA
A 21-story, steel-frame office building with urban plaza at ground floor and two levels of below-grade parking. Building area includes 370,000 square feet of office space and 160,000 square feet for parking and loading dock use. The podium and parking levels are precast concrete beams and columns with reinforced concrete slabs.
Oceanview Village, 3995 Alemany Boulevard, San Francisco, CA
This mixed-use project contains approximately 400,000 square feet of housing, approximately 190,000 square foot parking structure and ground floor and basement retail area of 90,000 square feet.
Olympic Club Downtown, San Francisco, CA
The Olympic Club is one of the oldest athletic facilities in the country, and its current facility is over 60 years of age. We have done many projects on this building for the past ten years. Our most recent project was the reconstruction of the natatorium building. During this reconstruction we rebuilt the entire pool and the decks that surround it. In addition, a new hydrotherapy pool will be installed.
Olympic Club Lakeside, San Francisco, CA
The Olympic Club Lakeside is one of the premiere golf clubs in the United States. The work done on this facility included the renovation of public and service areas; seismic upgrade of ground floor, basement and sub-basement levels; extension of dining room and enclosure of existing terrace, and addition of new fitness center in basement.
On Lok/Larkin House, San Francisco, CA
Seismic rehabilitation and renovation of four-story, 67,000 square foot, concrete and steel-frame structure. Added area totaled 6000 square feet. Installed new concrete shear walls for lateral load-resisting system, as well as rehabilitating existing terra cotta veneer system. Total area: 67,000 square feet.
On Lok/Dr. William Gee House, San Francisco, CA
Four-story, 65,000 square foot day health care, medical clinic and housing project for senior citizens. Included seismic rehabilitation of complete renovation of steel frame and concrete structure. Total Project Cost: $9 million.
Oracle Office Park, Redwood City, CA
This high profile campus is composed of six office buildings varying in height from eight stories to 16 stories; total square footage in excess of 1,300,000. In addition, there are four structured parking lots totaling over 1,100,000 square feet; and a fitness center and conference center. Construction is structural steel for the office buildings and a combination of poured-in-place and precast concrete for the parking structure.
Oracle Fitness Center, Redwood City, CA
This 36,000 square foot, steel frame recreation and fitness center was designed specifically for the employees of Oracle Corporation. The project is two stories in height. At one end of the facility is a basketball court; the other space is filled with a weight-training room, aerobics rooms, locker rooms, restaurant, etc. In addition, there is an outdoor lap pool.
Oracle Fitness Center Expansion, Redwood City, CA
After our successful first fitness center we have been requested to develop an additional building for the fitness center. The concept is to have an aerobics facility and meeting space on one floor with an open-air basketball court on the roof. The addition will be attached to the main fitness center via a bridge. Square footage is 5000 square feet.
Oracle 220 Parking Structure, Redwood City, CA
Five-level, 342,000 square foot garage with parking for 1000 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Oracle 320 Parking Structure, Redwood City, CA
Five-level, 385,000 square foot garage with parking for 1175 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Oracle 420 Parking Structure, Redwood City, CA
Five-level, 335,000 square foot garage with parking for 1000 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Oracle 520 Parking Structure, Redwood City, CA
Five-level, 248,000 square foot garage with parking for 725 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Oxnard Garage, Oxnard, CA
This project is a four-story parking structure with future provisions for retail space on the ground floor. This structure, capable of holding approximately 400 cars, will have access provided to the various levels through a circular speed ramp at one end of the structure.
Pacific Heights Towers, 1901 Van Ness Avenue, San Francisco, Ca
Another two-tower project, this one being 8 and 10 stories in height is also constructed out of reinforced concrete. The parking structure associated with this project is for approximately 200 cars. Three-level, below-grade, 108,000 square foot garage with parking for 300 cars. Structural system consists of a cast-in-place, two-way concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is a monolithic concrete mat.
Pacific Plaza Hotel, San Francisco, CA
Seismic upgrade of total plus additional floor on roof for a health club.
http://www.pacificplazahotel.com
Parc Regent Senior Housing, Los Altos, CA
This senior housing project consists of one- and two-story, wood-framed structures over a subterranean concrete garage structure; built in two phases consisting of 25 and 32 units, respectively. Total square footage - 100,000 square feet.
Park Hotel, San Mateo, CA
A 240-room hotel, with approximately 15,000 square feet of public function space. In addition to the hotel there will be a structured parking garage for approximately 375 cars.
Parkrose High School, Portland, OR
Two story, 200,000-sf steel frame high school and community center.
Peninsula Office Park, San Mateo, CA
This project, built in two phases, consists of a four-story, 139,000 square foot office building with a partial basement and a two-level, 173,000 square foot garage.
Peninsula Office Park Garage, San Mateo, CA
Two-level, 175,500 square foot garage with parking for 550 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
People Soft Campus, Site 56, Pleasanton, CA
Building G which is one of several to be built on this site will be five stories in height and have an L configuration. This building will be identical to the two existing office buildings on Site 57, with the exception of the building siting and the necessary foundation modifications.
People Soft Campus, Site 57, Pleasanton, CA
Site 57 contains two, five-story office buildings of approximately 178,125 square feet, each with a mechanical penthouse of 10,000 square feet; one 33,890 square foot commons facility, and one, four-story, 352,265 square foot parking garage. Construction is structural steel for the office buildings and a combination of poured-in-place and precast concrete for the parking structure.
People Soft Parking Garage, Site 57, Pleasanton, CA
Four-level, 352,000 square foot garage with parking for 1050 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings. This is the first of five parking structures.
Pine Larkin Senior Housing, San Francisco, CA
This senior housing project is a four-story, light steel frame and truss building installed on a concrete post-tensioned transfer slab, placed on top of an existing two-story post office. Total square footage - 50,000 square feet.
Portside I/Portside II, San Francisco, CA
This 10- and 12-story reinforced concrete condominium project has a parking structure separating the two towers. The structure is approximately 400,000 square feet and consists of 260 units.
Portside I Parking Garage, San Francisco, CA
Two-level, 110,000 square foot with parking for 350 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Preservation Park, Oakland, Ca
This condominium project contains approximately 90 units of lofts/flats, with half-basement parking.
Pruneyard Inn, Campbell, CA
This project consists of a three-story, conventional, wood-frame addition to a six-story office building, three-level parking complex.
Pruneyard Office Complex, Campbell, CA
This project consists of a six-story, steel-frame, office building of 130,000 square feet. The parking structure is a three-story concrete structure for approximately 800 cars and is 250,000 square feet. There is also a hotel addition for 54 rooms. This wood-frame structure will be 60,000 square feet.
Pruneyard Place Garage, Campbell, CA
Three-level, 240,000 square foot garage with parking for 700 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Quantum Office Buildings, Milpitas, CA
This project consists of two, two-story office buildings with square footage of 175,000 and 202,000 square feet, respectively. These buildings will be designed utilizing structural steel construction; vertical load-carrying system a combination of rolled and fabricated steel trusses; lateral system a series of eccentric braced frames; floor will be a metal deck with concrete fill on second floor and metal deck with rigid insulation on the roof.
Red Lion Hotel, San Jose, CA
Ten-story, 500-room concrete and steel frame structure that also required two 10,000 square foot ballrooms to be stacked. The use of structural steel was employed for the 60-foot spans.
Red Lion Hotel Parking Structure, San Jose, CA
Two-story, 110,000 square foot garage with parking for 350 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Regency Center, Santa Clara, CA
Four-level, 192,000 square foot garage with parking for 575 stars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Regency Center II, San Rafael, CA
Three-story office building, approximately 118,000 gross square feet, with first floor having a larger footprint that the upper two stories. Building built utilizing structural steel with metal deck and concrete floors; exterior cladding is a combination of precast concrete and glass curtain wall. Estimated construction cost $8,500,000.
Reno/Tahoe Technology Center, Building 2 and Building 3,
Reno, NV
Buildings 2 and 3 of this project are each two-story, 60,000 square foot buildings, essentially identical to each other.
River Corporate Center, San Jose, CA
This project consists of three, steel-frame office buildings; Buildings I and II are five-story, 148,000 square foot, mirror images. Building III is a seven-story building enclosing approximately 175,000 square feet.
River Pacific Residential Project, Santa Cruz, CA
This residential project will consist of a four-story condominium building with retail and common space over a one level below-grade garage.
Riverbend Hotel and Spa, Napa, CA
The Riverbend Hotel is a five-star hotel, which is three stories in height with a partial basement that is used predominantly for parking, with some back-of-house use. The project calls for the placement of hotel rooms on top of the ballroom and back-of-house space.
Roundhouse Plaza, San Francisco, CA
Concrete building; added floor, reconstruction of existing shell, seismic upgrade.
Rowland Plaza Office Building, Novato, CA
Three-story office building, constructed utilizing steel frame construction with the first floor being a supported slab off the concrete pile foundation system; approximately 80,000 gross square feet.
Sacramento County Main Jail, Sacramento, CA
Reinforced concrete structure twelve stories in height. Approximately 550,000 square feet.
Construction cost over $80,000,000.
St. Francis Hospital, San Francisco, CA.
Addition of 1-story concrete shear wall building designed with provisions for future addition of 5 more stories; floor system consisted of pan-joist with reinforced concrete columns. There was also an installation of a new Phillips' MRI scanner in the existing ground floor level and new mechanical units on the third floor roof and duct penetrations at the second floor.
St. Helens Elementary School, St. Helens, OR
Approximately 81,000-sq ft 1-story wood frame construction with 3 to 12 roof pitch at classrooms, 30-ft span I-joists. Tilt-up concrete walls with glue lam beams & wood joists at gym and cafe. 80-ft structural steel truss between gym and cafe.
St. Mary's Home For Boys, Recreation Building, Beaverton, OR
The campus recreation building houses a natatorium and gymnasium as well as locker facilities and administration. The 17,000-sf building is one-story wood frame construction with exterior CMU walls.
St. Mary's Hospital, San Francisco, CA
This project included the installation of a Siemens C-arm and corresponding equipment; relocation of existing OR light; installation of ceiling-hung monitors, conduit, cable support and bracing, wall-mounting cabinets and new walls and ceiling at C-arm room.
San Francisco Firemen Credit Union, San Francisco, CA
A two-story office building over a basement garage, with a total enclosed area of approximately 40,000 square feet; designed utilizing structural steel construction.
San Francisco General Hospital, San Francisco, CA
This project consisted of additions to Building 1 at the southeast corner of Potrero and 22nd Streets. The building is three stories tall and is connected to three, two-story wings to the south.
San Francisco International Airport Garage, San Francisco, CA
Added two stories over existing garage for a total of five stories. Conventionally reinforced concrete construction with a deep pile foundation system due to Bay mud deposits. (1000 cars)
San Mateo Park Hotel, San Mateo, CA
Four-level, 120,000 square foot garage with parking for 375 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
San Tomas Office Campus, Santa Clara, CA
This project consists of two new three-story office buildings enclosing approximately 119,000 square feet each. Buildings A and D are identical, with Buildings B and C to be designed at a later time.
Santa Clara Courts Facility, San Jose, CA
This six-story plus one basement steel frame building consists of 125,000 square feet.
Construction cost estimated at $20,000,000.
Santa Clara University Residence Hall, Santa Clara, CA
This project consists a new four-story, 74,000 square foot residence hall, a new one-story, 9,000 square foot common space connector to existing Casa Italiana Residence Hall and a new garage entrance to the existing Sobrato Hall Garage.
Santa Rosa Icehouse, Santa Rosa, CA
Brick & concrete building; seismic upgrade & new roof structure.
School of Optometry University of California Berkeley,
Berkeley, CA
Two-story, 22,000 square foot addition of laboratory space to existing structure, including seismic upgrade of 44,000 square foot building. Steel frame floors with concrete walls.
Seaport Plaza, Redwood City, CA
A project consisting of two, three-story, mirror image office buildings, each office building will be constructed over a one-level parking garage.
Seaport Plaza, Redwood City, CA
One-level, 55,000 square foot garage with parking for 160 cars.
Structural system consists of cast-in-place, two-way concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Sequoias Skilled Nursing Facility, The, San Francisco, CA
This project consisted of alterations to Level A; a new elevator; corridor upgrade; atrium, redesign of grade beams; CMU wall at stairs and alterations to new Building.
Seven Directions, Health Care & Housing Project, Oakland, CA
This health care/housing project will consist of three levels of housing over a two-level concrete structure, which will enclose medical offices, parking and service uses.
Shaklee Corporate Campus, Pleasanton, CA
This project contains two buildings, one three-story office building and one two-story conference center. The office building contains approximately 105,000 square feet and the anticipated construction methods is structural steel vertical and lateral systems utilizing metal deck with concrete fill for the floors. The conference center building contains approximately 20,600 square feet; structural steel is the anticipated construction of this building as well.
Shipley Square, San Francisco, CA
This five-story, mixed-use project with parking in the basement has retail on approximately one half of the first, or ground floor, and residential on the remaining floors.
Silverton Union High School,
General Structural Evaluation,
Silverton, OR
Seismic evaluation of existing multi-building campus totaling 130,000-sf, constructed over a 50-year period.
Skyport Plaza, Phase I, San Jose, CA
A project consisting of three new, eight-story office buildings; two four-level parking garages, one containing 1180 stalls and the other 650 stalls; a one-story and a two-story retail building. The total square footage for this office and parking project is approximately 1,285,648 square feet.
Skyport Plaza Center Garage A, San Jose, CA
Four-level, 389,000 square foot garage with parking for 1200 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
Skyport Plaza Center Garage B, San Jose, CA
Four-level 210,000 square foot garage with parking for 700 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
Snowy River Development, Big Sky, MT
This three-story, wood-frame structure will be built over a poured-in-place concrete basement used for parking. There will be some structural steel for the longer spans of the Porte Cochere, and the great rooms of the public space and living areas of the third floor will have exposed wood frame roof systems and will capture the volume of the sloping roof.
Solano County Justice Center, Fairfield, CA
Reinforced concrete structure five stories in height. Approximately 260,000 square feet.
Construction cost of over $32,000.000.
South Valley Intercommunity Hospital, Gilroy, CA
This project was for a $12 Million, 98,000 square foot, structural-steel hospital.
Spanish Bay Resort Hotel, Pebble Beach, CA
This predominantly wood frame hotel of 700,000 square feet, also required long span for the double stacked ballrooms. Spans were a moderate 50 feet and were handled using conventional wide flange steel beams. Estimated construction cost $40 million.
Stacys Bookstore, San Francisco, CA
Seismic rehabilitation, plus addition of two additional stories.
Stanford University, Gates Science Building, Palo Alto, CA
Five-story, steel frame structure designed to serve as a faculty office building, research and teaching facility. Estimated construction cost $24 Million.
Stanford University Medical Center, Animal Cath Angio,
Palo Alto, CA
This work included structural support for ceiling-hung, wall-mounted and floor-mounted equipment, as well as the addition of a new air-handling unit in the interstitial space above the Animal Cath Angio Lab.
Stanford University Medical Center, Cath Angio Expansion,
Palo Alto, CA
This project included the construction of three new Phillips Cath Angio suits in the existing Stanford University Medical Center, and structural support for ceiling-hung and floor-mounted cath angio equipment.
Stanford University Medical Center, MRT Installation,
Palo Alto, CA
This project included numerous steps regarding support and accommodation of a new MRT unit: new footing for support; new slab-on-grade in MRT room and support spaced; underground trench for new medical gas piping; new mechanical unit on the existing roof; new openings for duct work and anchorage details for mechanical equipment.
Sugar Bowl Ski Area Parking Structure, Norden, CA
Three-level, 90,000 square foot garage with parking for 250 cars.
Structural system consists of concrete fill over metal deck spanning to wide flange steel beams supported on wide flange steel columns. The lateral load-resisting system utilizes steel braced frame and moment frames. The foundation system is shallow spread footings.
Summit Hotel, Big Sky, MT
This 10-story, steel frame, 100-room hotel is currently being built in heavy snow and mountainous conditions over a two-year period. Additional complications include building in Seismic Zone 4. This plans on being the premiere destination hotel in the State of Montana, with a total square footage of 290,000 square feet with an estimated construction cost of $25,000,000.
Sunnyvale Civic Center, Sunnyvale, CA
Three, five- and six-story, steel-frame office buildings springing four-level, below-grade, concrete garage. Building area includes a total of 600,000 square feet of office space, 200,000 square feet of structured plaza, and parking for 1600 cars.
Symantec Corporation, Cupertino, CA
One building, four stories in height with three basement levels of parking. The above-grade structure is designed using structural steel; the at-grade level, in addition to the basement, is poured-in-place concrete. There are approximately 143,000 square feet of office space and 280,000 square feet of parking. In addition, at grade is an approximately 55,000 square foot landscaped area, which is on supported structure.
Terman Engineering Center, Stanford University, Palo Alto, CA
This 150,000 square foot structure is five stories in height and is comprised of two buildings; one building a concrete library, the other a five-story, wood-frame structure. This structure has been noted by the American Society of Civil Engineers as one of the classic wood structures in the United States.
Town School for Boys, San Francisco, CA
This project consisted of a preliminary structural system for addition of a classroom wing and Auditorium addition.
Treat Towers, Pleasant Hill, CA
Two, ten-story office buildings of approximately 187,500 square feet each with parking below grade and a parking structure of four stories above grade, for approximately 370,000 square feet and a Plaza of approximately 50,000 square feet. Office buildings are designed utilizing structural steel and the above-grade and below-grade parking is designed utilizing poured-in-place concrete construction
Treat Towers, Pleasant Hill, CA
Five and one-half-level (two below grade), 375,000 square foot garage with parking for 1200 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting utilizes cast-in-place concrete shear walls. The foundation system is a monolithic concrete mat.
Tualatin High School-Auditorium Addition, Tualatin, OR
An 18,000-sf theater addition to 1990 high school project consisting of a stage with fly loft, approx. 60-ft in height, concrete tilt up walls and steel framed roof at house and stage, with wood studs and roof at lobby.
Tualatin High School-Swimming Pool Addition, Tualatin, OR
16,000-sf swim center addition to 1990 high school project. Steel framed roof, 95-foot span over pool. Concrete masonry walls.
U.S. Public Health Hospital, San Francisco, CA
Study to determine adequacy of existing structures; original building early 1900's; addition in early 1960's.
University High School, San Francisco, CA
Project was 7000 square feet in expansion and additions in two areas, including new classrooms and gallery below grade, addition of elevator shaft, which will be attached to the Auditorium/Library building, and a bridge of 350 square feet connecting the lower campus to Student Center.
University of the Pacific, Sciences Complex, Stockton, CA
This is a three-building science complex, which will be use for the Biology, Chemistry, and Physics/Mathematics Departments. The Biology Building two stories and 26,560 square feet will be the first phase of this project.
University of California at Berkeley
Genetics and Plant Biology Building,
Berkeley, CA
Reinforced concrete research and teaching lab facility with two levels underground parking; approximately $35 million.
University of California at Berkeley
School of Optometry,
Berkeley, CA
Two-story, 22,000 square foot addition of laboratory space to existing structure including seismic upgrade of 44,000 square foot building. Steel frame floors with concrete walls.
University of California at Davis
Food and Agricultural Building
Davis, CA
This project consisted of two new, reinforced concrete and post-tensioned concrete buildings, with a budget of approximately $35 million.
University of California at Davis
Medical Center Admissions Building,
Davis, CA
A project consisting of tenant improvement to the Medical Center Admissions Building and alterations to the West Wing of the complex.
UCSF Adult Pulmonary Laboratory, 13th Floor, Moffitt Hospital
San Francisco, CA
Work on this facility consisted mainly of minor additions: new freestanding wall; new accordion door; new wall-mounted casework; new door opening in existing walls.
UCSF Medical Center/SF General Hospital Lung Biology Lab,
San Francisco, CA
This project was the infill of an existing inner courtyard, which consisted of two occupied levels plus a roof. The design solution was structural steel with metal deck and concrete floors.
UCSF Medical Center/UC Hospital, 4th Floor Lab,
San Francisco, CA
In preparation for a remodeling project structure was checked for loading, etc.
UCSF Medical Center/UC Hospital, ENT Lab Alterations,
San Francisco, CA
Structural calculations and details for mechanical equipment on the roof of the existing USCS Hospital for the ENT Lab.
UCSF Medical Center/UC Hospital, Health/Science Building,
San Francisco, CA
Design of corridor connection between the Health Science Building and adjacent structure; installation of numerous floor drains; support for movable partition; assist in design of ceiling eyebrow, grid and support system; also a cooling tower pad installation outside of building.
Upper Lake Merritt Housing, Oakland, Ca
This is an eighteen-story project consisting of approximately 575,000 square feet, which contains 220,000 square feet of parking for approximately 410 cars.
Uptown Village, Vancouver, WA
This project is a new 120,000-square foot, mixed-use block development, consisting of a four-story, 45,000-square foot apartment building; multiple two-story town homes totaling 30,000 square feet; two 2,000-square foot, one-story retail buildings; and a 41,000-square foot landscaped plaza over subterranean parking. The housing and retail are wood frame, while the plaza is p/t concrete construction.
USF Koret Parking Platform, San Francisco, CA
Two-level, 55,000 square foot garage with parking for 150 cars.
Structural system consists of a cast-in-place, two-way, post-tensioned concrete flat slab supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings
Veritas Campus, Milpitas, CA
This project is two-phase, each consisting of three buildings. Phase I will be one two-story and two three-story buildings with a total of approximately 464,000 square feet. The three buildings in Phase II will be two stories, three stories and four stories for approximately 522,000 square feet.
Veritas Corporate Headquarters, Mountain View, CA
This campus project consists of four, four-story office buildings consisting of approximately 403,000 square feet, a one-story commons building of approximately 22,000 square feet, and a three-level, 106,000 square foot parking structure
Villa North Beach, Building 'A', San Francisco, San Francisco, CA
This project comprises four floors of Type V condominiums over a one-level, reinforced concrete garage with enclosed areas; Garage - 15,000 square feet/Housing Units - 50,000 square feet.
Wasco Reception Center, Kern County, CA
New correctional facility both one and two stories. 480,000 square feet, precast and poured-in-place reinforced concrete.
Total Project Cost: $51 million.
Washington Landing, San Francisco, CA
This project is anticipated to be a housing project, which will also include parking, retail and a health club. The structure is to be eight stories in height with one basement level to be used for parking, with the possibility of an additional subterranean parking structure.
Watergate IV Office Complex, Emeryville, CA
An 18-story, steel-frame office building with attached four-level concrete parking garage. Building area includes 360,000 square feet of office space and parking.Four-level, 280,000 square foot garage with parking for 825 cars. Structural system consists of one-way cast-in-place post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
Wells Fargo Center, Sacramento, CA
Six-level, 320,000 square foot garage with parking for 950 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
West Linn-Wilsonville School District,
FEMA 178 Seismic Assessment,
West Linn, OR
Seismic evaluation of nine schools in this School District. Submitted report on the expected performance of each facility during a seismic event. A FEMA 178 study was conducted on each facility as well.
Western Research Institute, Richmond, CA
Phase 1A of this project consists of two, three-story Class A life science buildings, each of which is 90,000 gross square feet and anticipated to be similar but not identical.
Westview High School, Beaverton, OR
Two story, 260,000-sf concrete masonry/steel frame high school with a 600-seat performing arts theatre, practicing theatre and a 2,000-seat gymnasium ($22 million).
Yahoo! Corporate Campus, Sunnyvale, CA
This project consists of four new office buildings; two four-story and two five-story buildings, with a total of 740,000 square feet; a Commons Building of approximately 60,000 square feet and a Parking Structure enclosing approximately 300,000 square feet.
Yahoo! Corporate Headquarters Parking, CA
Four-level, 300,000 square foot garage with parking for 940 cars.
Structural system consists of one-way cast-in-place post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings.
Yerba Buena West, San Francisco, CA
This building was a six-story, 300,000 square foot, office building, with below-level parking; four of these levels were of reinforced concrete and two levels of structural steel and concrete.
YMCA Torrance , Torrance, CA
Two-story, 40,000 square foot, steel frame and concrete block wall recreation and health facility featuring 70 foot by 100 foot clear span gymnasium with perimeter running track at second level and 7000 square foot natatorium.
http://www.ymcala.org/Branch/Default.aspx?ENT=68
10 Almaden Parking Structure, San Jose, CA
Six-level, 340,000 square foot garage with parking for 1000 cars.
Structural system consists of one-way, cast-in-place, post-tensioned concrete slab supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is precast concrete driven piles.
24-Hour Nautilus, 1200 Van Ness Avenue, San Francisco, CA
This project cons |